PH/ORP-8851 Water Quality Test PH/ORP Controller
On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;

On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;

ZR type double tank floating bed control valve including ZR4-1/ZR4-1S(Side Loading), ZR10-1/ZR10-1S(Side Loading). It is equiped the inlet flow Meter and drainage flow meter, All the parameters is set by water volume, The double swap tank is for Alternating regeneration. Continuous water production, Water quality is stable , Adapted to the to high hardness water softening, such as the steam boiler and heating engineering and production process water.

Meter, time clock dual mode. In flow mode, the internal flow transmitter realizes the function of setting water volume as required. After setting regeneration water volume and cleaning water volume of exchange tank, the period of softening water amount (ton) according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.

Meter, time clock dual mode. In flow mode, the internal flow transmitter realizes the function of setting water volume as required. After setting regeneration water volume and cleaning water volume of exchange tank, the period of softening water amount (ton) according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.

GR20\40\50\20T\40T series up flow regeneration fixed bed large valve series, water production range is 15T/ h-70t /h, the inlet flow meter is used to set the cycle of water production, slow backwash water and wash water, and the brine flow meter and the brine electric valve are used to specifically measure brine absorption and salt tank water supply.In the flow mode, the internal flow transducer realizes the switch of all stations as long as the amount of brine,the amount of slow washing water and the amount of washing water is set according to the volume (liter) of the swap tank. After the period of softening water amount (ton) is set according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.

Easily-adjustable, 5-cycle, downflow-brining control
Rugged, long-life construction features a lead-free brass valve body
Uses conditioned water for regeneration

One kind of popular and cost-effective online pH/ORP controller.

1) Working Position : Filter->Back Wash->Fast Rinse->Filter
2) Using ceramic moving valve disk , small rotation torque
3) Abrasion resistance of the sealing surface, outstanding and long-lived deal.
4) It could be operated with pressure directly.

Single stage RO controller used for conductivity monitoring and process program control .