No products were found matching your selection.
Other Related Products
-

ZR type double tank floating bed control valve including ZR4-1/ZR4-1S(Side Loading), ZR10-1/ZR10-1S(Side Loading). It is equiped the inlet flow Meter and drainage flow meter, All the parameters is set by water volume, The double swap tank is for Alternating regeneration. Continuous water production, Water quality is stable , Adapted to the to high hardness water softening, such as the steam boiler and heating engineering and production process water.
-


Fluorescence quenching principle, no need for internal filling, no oxygen consumption, and easy maintenance;
The service life of the fluorescent membrane cap is more than one year (under ideal conditions);
Original altitude, atmospheric oxygen partial pressure, temperature compensation, to improve the authenticity of the data;
-

High Cost-Effective ,widely used for chemical industry,paper making industry,industrial coating,pharmaceutical,food,beverage,municipal water,Environmental and so on.
-

On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;
-

Suitable for large residential/light commercial applications
Fully adjustable, 5-cycle control delivers controlled upflow backwash, downflow brining and slow rinse, rapid rinse, timed brine refill and downflow service
Backwash capacity handles tanks up to 24″ diameter
Mechanical control (7- or 12-day clock or metered initiated regeneration)
Valve body is solid, lead-free brass
Time tested, hydraulically-balanced piston, seal, and spacer concept to pilot service flow and regeneration
-

This series instruments are widely used for online pH/ORP monitoring in environment protection water treatment, pure water treatment, industrial process and so on.
-

Single stage RO controller used for conductivity monitoring and process program control .
-

Meter, time clock dual mode. In flow mode, the internal flow transmitter realizes the function of setting water volume as required. After setting regeneration water volume and cleaning water volume of exchange tank, the period of softening water amount (ton) according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.
-

Single stage RO controller used for conductivity monitoring and process program control .