No products were found matching your selection.
Other Related Products
-

Time-tested hydraulically balanced piston, seal and spacer design to pilot service flow and regeneration
Solid, lead-free brass valve body for superior strength and durability
Backwash capacity handles tanks up to 30″ diameter
1-1/2″ top mount control valve ideal for smaller size commercial/industrial applications
Consistent brining regardless of salt levels with timed brine refills
Choice of 7 or 12 day clock, manual or meter
Continuous flow rate of 51 GPM with a backwash of 49 GPM
-


Meter, time clock dual mode. In flow mode, the internal flow transmitter realizes the function of setting water volume as required. After setting regeneration water volume and cleaning water volume of exchange tank, the period of softening water amount (ton) according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.
-

1) Working Position : Filter->Back Wash->Fast Rinse->Filter
2) Using ceramic moving valve disk , small rotation torque
3) Abrasion resistance of the sealing surface, outstanding and long-lived deal.
4) It could be operated with pressure directly.
-

CL-9500 residual chlorine controller is a new controller. This meter has a high degree of intelligence and flexibility. It can measure Residual chlorine value and temperature at the same time. It is widely used in urban sewage treatment plants, water supply and other industries and can continuously measure the Residual chlorine value of solution.
-

Widely used for online measurement of acid&alkali in low concentrations and the low viscosity single-phase fluid of non-trade settlement process.
-

Single stage RO controller used for conductivity monitoring and process program control .
-


- On-line analysis of municipal water tank disinfection
- Chlorine supplement control of pipe secondary pressurization (no negative pressure)
-

FLECK control valve 5600 softening water equipment generally uses fixed bed downstream
regeneration, the working process is operation, backwashing, regeneration, replacement,
positive washing, salt tank water injection.
-

RF double tank floating bed plane multi-way valve, realized tow tank softening at the same time and regenerating alternate, integrated with brine jet device and brine flow meter and brine electric valve, with soft water flow meter, guarantees the water softening , the water regenerating and water filling to salt box, Complete according to the set volume.as long as the factory according to the raw water hardness set corresponding operation parameters, can always guarantee the stable operation of the equipment, guarantee the softened water and salt consumption.