FLECK Control Valve 9100
Salt and water savings by using 100% capacity of the tank in service before switching to the second tank
Regenerates immediately when needed for continuous soft water
Corrosion-free fiber-reinforced polymer valve body

Salt and water savings by using 100% capacity of the tank in service before switching to the second tank
Regenerates immediately when needed for continuous soft water
Corrosion-free fiber-reinforced polymer valve body

On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;

Total Chlorine (DPD) Online automatic analyzer is mainly used for real-time monitoring of water plants, secondary water supply of pipe network, medical wastewater, kidney dialysis medical water, food and beverage water, swimming pools, circulating cooling water, enterprise discharge wastewater and other occasions.

Typical applications • Widely used in thermal boiler deaerator water and large and medium-sized industrial boiler feed water; • Operational supervision of reactor Primary circuit, secondary circuit circuits and condensate system; • On-line analysis of dissolved oxygen in circulating water of heat exchange system; • Deaeration control of marine fresh water system, thermal system and…

Digital Laser Turbidity online analysis sensor,It can be used for on-line monitoring of water quality in different water bodies such as waterworks and membrane filtrate,The sensor internally completes all measurement calculation compensation

On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;

Widely used for electric power,electronics,metallurgy,petrochemical,pharmaceutical ,food and beverage,environmental protection field.

RF double tank floating bed plane multi-way valve, realized tow tank softening at the same time and regenerating alternate, integrated with brine jet device and brine flow meter and brine electric valve, with soft water flow meter, guarantees the water softening , the water regenerating and water filling to salt box, Complete according to the set volume.as long as the factory according to the raw water hardness set corresponding operation parameters, can always guarantee the stable operation of the equipment, guarantee the softened water and salt consumption.

Flexible 7 or 12 day time clock or meter initiated regeneration
Fully adjustable, 5-cycle control delivers upflow back wash, downflow brining, slow rinse, rapid rinse and down flow service
Designed for single tank or multi-tank systems, alternating or interlocking
Continuous flow rate of 250 GPM