No products were found matching your selection.
Other Related Products
-

Multiplex display, display window with free configuration of 2/4 parameters;
Support bus data acquisition of 1-4 channels with arbitrary attributes;
Support 1 way two-wire system 4-20mA variable input;
Support WiFi and LORA and other wireless data acquisition;
The 3-way control output can be configured with the over-limit alarm or DI associated output of any measurement channel.
Fully sealed, wall-mounted shell, according with site protective capability of IP65 protection type.
With CE certification
-

FLECK control valve 5600 softening water equipment generally uses fixed bed downstream
regeneration, the working process is operation, backwashing, regeneration, replacement,
positive washing, salt tank water injection.
-

1) Working Position : Filter->Back Wash->Fast Rinse->Filter
2) Using ceramic moving valve disk , small rotation torque
3) Abrasion resistance of the sealing surface, outstanding and long-lived deal.
4) It could be operated with pressure directly.
-

CM-230s conductivity meter is an upgrade of the old CM-230, is an economic intelligent industrial online conductivity meter
1. full range (0~20/200/2000) automatic switching, intelligent digital temperature compensation;
2. display unit can be changed: uS/cm or ppm
3. conductivity & temperature can be displayed on the same screen
-

This series instruments are widely used for online pH/ORP monitoring in environment protection water treatment, pure water treatment, industrial process and so on.
-

Widely used for electric power,electronics,metallurgy,petrochemical,pharmaceutical ,food and beverage,environmental protection field .
-

On-line analysis and process control of the oil refining, metallurgy,chemical synthesis industry process;
-

ROC-8221 is a combined control instrument of a single-stage reverse osmosis controller and double-channel on-line conductivity instrument.
-

Meter, time clock dual mode. In flow mode, the internal flow transmitter realizes the function of setting water volume as required. After setting regeneration water volume and cleaning water volume of exchange tank, the period of softening water amount (ton) according to the hardness of the raw water, each station decreases to “0” according to the set value, and stops decreasing and maintains when the water is out of service or no water.